2014 Stadt Lauchheim - Federal Republic of Germany - New Sports Gymnasium / Energy Concept & Design
|
Technical Advisor to Stadt Lauchheim, assisted by ingbey (Hagen) and D.Kraft PM (Nentershausen) Technical advice, concept and design of the energy configuration of the new sports gymnasium. Developing an optimized combination of building hull energy efficiency and technical installations efficiency together with a full optimized use combination with an existing gymnasium and its facilities and potentials directly adjacent. Energy Balance Sheet calculations and report. |
2011 to 2014 Energy Consulting for Industry and Commerce - Federal Republic of Germany - KFW Program Studies & independant Energy Efficiency Consulting for various Clients
|
Technical Advisor to GEMB, since 2013 independant KFW listed Energy Consultant Technical advice and energy efficiency evaluation and solution development in industrial and commercial facilities & work environments of:
services and consultant offices
hospitality and food preparation / restaurants
industrial production - metal workshop and metal shaping
industrial production - wood and modern materials workshop & modell construction
industrial production - assembley and testing
industrial production - support facilities, engineering & offices
industrial production - teaching and education workshop
|
2013 Yakatoot & Khanaqa - Ghal District - Afghanistan - GIZ Mission on Expert assessment of technical quality of the solar hybrid decentralized electrical schemes
|
Technical Advisor to GEMB Technical advice and back office support to GEMB personell on location, on photo-voltaic placement schemes, solar astronomy analysis, lead acid battery long term storage issues, battery & island inverter buffered pv installations without grid connection or other means of stabilizing power supply, hydro-electric power plant options for small rivers. |
2012 SOS Childrens Villages & Hospital - Liberia - GIZ Evaluation Misson on Renewable Energy Systems Implementation
|
Technical Advisor to GEMB Technical advice on hydro-electric power plant options for small rivers. Review of Energy Economics Evaluation. |
2012 Dolpp GbR - Lauchheim - Federal Republic of Germany - Photo-voltaic Power Plant on Production Facility Roof |
Technical Advisor to Dolpp GbR Technical advice, concept development and project management of the installation of a 40kWpeak photovoltaic power plant on an industrial roof |
2012 Munich International Airport Franz Josef Strauss - Federal Republic of Germany - Evaluation of Large Scale Photo-Voltaic Powerplants on Roof Areas
|
Technical Advisor to FMG (airport company) Technical advice to the environmental department of the airport, developing a multiple technology evaluation study for the implementation of photo-voltaic power plant installations on the roofs and south facing facade of 3 large area buildings.
Evaluation of power production expectations,
Development of electricity price models incorporating costs of installations, operations, maintenance, upkeep and parts replacements for powerplant productive lifetimes of between 20 and 60 years.
Analysis of airport systems, ANS systems & reflection blinding of tower or aircraft issues.
Analysis of building lightning protection system impact and reconciliation of pv-installations and lightning protection installations
|
2010 & 2011 LEAF GbR - Lauchheim / Friedewald - Federal Republic of Germany - Photo-voltaic Power Plants on Three House Roofs
|
Technical Advisor & Co-Investor to LEAF GbR Technical advice, concept development and project management of the installation of a 13.75kWpeak and a 11.75kWpeak photovoltaic power plant on two house roofs. Technical advice & concept development for the installation of an 8kWpeak photovoltaic power plant on a house roof. |
2004 to 2008 Vienna International Airport - Republic of Austria - Apron Expansion North-East Phase 2
|
Deputy Project Manager & Project Coordinator to Werner Consult for a General Design & Construction Oversight Project General Design Contract on Apron Expansion and Refurbishment to restructure the airport configuration around the new Skylink Terminal. Full engineering services covering all aspects of civil, mechanical & electrical engineering including:
expansion and technical reconfiguration of the aircraft deicing facilities by 50% of area and 100% of capacity without additional pumping stations and with energy consumption optimized frequency controled pumps as refurbishment of the existing pumping station including a flow control & pumping program for optimized storage basin use.
Optimization of temporary airside road detour concept to achieve an energy consumption - maintenance - availability optimum balance for apron service vehicles during construction phasing
|
2004 to 2005 Vienna International Airport - Republic of Austria - Apron Expansion GAC
|
Technical Advisor to Werner Consult for a General Design & Construction Oversight Project General Design Contract on Apron Expansion for a new area connecting the new GAC Terminal at the western end of the airport. Technical advice on the concept development of the capacity flow optimized storm drainage system. Avoiding the need for a pumping station and a pressure pipe by developing a flow control scheme for possibly contaminated water, protected by a dip-weir/syphon secured clean water overflow into a seapage basin with biological cleaning capacity. |
1996 to 1999 Athens International Airport Eleftherios Venizelos - Greek Republic - NAIA International Construction Contract
|
Employee with ICC Consortium Leader HOCHTIEF NAIA Design Built Construction Project within 51 months, within a PPP/BOT Concession Structure Energy Efficiency Items introduced among other items:
Initiation and coordination within the consortium of remote obstacle lighting power supply with battery buffered photo-voltaic arrangement
Optimized collection of possibly contaminated run-off water with performance sizing & selection of pumps and oil-water separator facilities, to ensure maximum efficient skim collection of the water-oil mix.
Postions & Functions or Dr. Axel Laistner held within HOCHTIEF NAIA:
Head of Department construction management of utilities and building connections – whole airport
Section Leader (multiple)design & engineering coordination responsible for airport outside of building detailed design & approval, and lead engineer underground utilities and systems, design coordination airport functional and aircraft movement areas and road systems including the necessary infrastructure of the project
|
1993 to 1996 Utility Tunnel Research Project
1995 Leipzig Kiebitzmark
1994 to 1995 Lauchheim Hardtsteige 2
1992 to 1995 Fahrland Am Königsweg
1992 to 1994 Wachau Gewerbegebiet Nord
|
Employee with POET Engineering Consultants urban and rural developments for industry, commerce & housing sustainable town development - implementation, research & technology development
From the mid 1980s to the ealry 2000s POET Enginnering Consultants were instrumental in the development of community PPP & BOT projects as well as the creative design of sustainable urban and rural human habitats and work environments.
In successful projects ideas and design principles for sustainable development were created in productive multidiciplinary design & research environments. Then these ideas were tested and implemented on site in real urban growth & rehabilitation situations.POET Engineering Consultants thereby created an important example basis and verification projects for many of the now current principles of regional & urban planning taught globally for sustainable human habitat creation.
Together with partner company IfEU GmbH projects were successfully executed from research concept development through urban planning and zoning to on site development & project management & PPP facilitation, energy supply system development to final result and performance validation research.
In cooperation with VOEST ALPINE KREMS FINALTECHNIK, VAU, KFW Pipes and the Technical University Wien - IVV the technology of the utility tunnel was significantly advanced in its technical development and its operational parameter definition.
Postions & Functions of Dr. Axel Laistner held within POET Engineering Consultants: non-executive co-owner lead engineer for:
utility and supply systems networks, utility tunnels, storm drainage,
integration of supply & safeguarding systems with urban planning & sustainable environment creation.
technology & esearch pesentation & marketing
lead researcher for utility tunnel technology:
hull materials research & development,
outfitting & installations development
utility systems integration studies,
systems safety & security studies & evaluations
systems economic studies, business model development, LCC evaluation, macroeconomic comparative analysis of soil buried utilities vs. utility tunnel systems
civil and public law impacts on the utility tunnel technology
painting by Paul Groll 1995 created for POET IngGmbH
|